Skip to content

Projects

Road Management Tool

Digital management of the road network

A web dashboard to know the roads section by section: length by sector, surface, network condition, road type and cost of works.

GéoDataNumRoad Management ToolSample townSector 3Sector 2Sector 1All sectors182,4km of roads1 240road sections surveyed241bn FCFA theoretical cost47 %in very poor condition36 %in good conditionDistrictsTown centreSector 1PlateauSector 1SeafrontSector 2Les ManguiersSector 2Cité des PalmiersSector 3Port areaSector 3Belle-VueSector 4Station districtSector 4Les CocotiersSector 4SurfaceSand97,8Asphalt63,5Laterite13,9Paving5,9Concrete1,3kmRoad typePrimary25 %Secondary45 %Tertiary24 %Track6 %Theoretical construction cost241bn FCFA GéoDataNumRoad Management ToolSample townSector 3Sector 2Sector 1All sectors182,4km of roads1 240road sections surveyed241bn FCFA theoretical cost47 %in very poor condition36 %in good conditionSection T-0412GoodMediumPoorVery poorSelected sectionSection T-0412 recordStreetRue des PalmiersTypeSecondarySurfaceAsphaltLength640 mWidth7 mLast works2019StatusPoorRecommended rehabilitation: 0.64 bn FCFANetwork conditionGood36 %Medium5 %Poor10 %Very poor49 %Condition is rated in four classes,surveyed on site, section by section. GéoDataNumRoad Management ToolSample townSector 3Sector 2Sector 1All sectors182,4km of roads1 240road sections surveyed241bn FCFA theoretical cost47 %in very poor condition36 %in good condition2027 works programmeSectionStreetWorksLengthCostPriorityQ1Q2Q3Q4T-0412Rue des PalmiersRehabilitation640 m0.64 bnHighT-0108Avenue du PortRehabilitation1,200 m1.80 bnHighT-0731Rue du MarchéConstruction450 m1.13 bnMediumT-0256Boulevard du Bord de merMaintenance2,300 m0.23 bnNormalT-0917Voie de la GarePaving380 m0.19 bnNormalT-0563Chemin des CocotiersConstruction520 m1.30 bnMediumCost of works per kilometreConstruction2.5 bn FCFARehabilitation, very poor condition1.5 bn FCFARehabilitation, fair or poor condition1.0 bn FCFAPaved road0.5 bn FCFA2027 budget committed5,3bn FCFA73% of the annual budget, six sections
Animated mock-up. Fictitious data. Swipe to see the whole mock-up.

An UrbanGovTools Platform solution

The road network, mapped and costed

Road Management Tool is part of the suite of planning tools hosted on UrbanGovTools Platform. UrbanGovTools Platform is the territorial governance platform developed by GéoDataNum. It brings together urban planning, public service management and revenue tracking, on a database shared by every department.

The dashboard shows road length by sector, network condition, road type and the related costs. Each district is one click away.

Know every road, section by section
Every section is identified, geolocated and described: surface, width, length, condition, last works.
Plan maintenance instead of reacting
Surveyed condition and traffic set the priorities. The municipality repairs what is deteriorating before rebuilding becomes unavoidable.
Cost it before deciding
Theoretical construction cost, maintenance cost, length concerned: the budget is discussed on figures tied to places.

Digitise your road network roadmap

  • Visibility of the network

    An overview of the roads, for the whole municipality or a single sector.

  • Identification and geolocation

    Every section and structure has an ID, a route and a technical record.

  • Updates and reporting

    Technical services keep the data up to date; residents report damage from their phones.

  • Easier collaboration

    The municipality, utility operators and contractors share the same information.

  • Alerts on damage

    Potholes, subsidence and damaged structures are flagged and dealt with faster.

  • Planning of works

    Routine maintenance, rehabilitation and extension are planned in the tool, with their cost.

How a deployment works

  1. Survey

    Driving the network with a GPS-enabled tablet: route, surface, condition.

  2. Database

    Structuring the assets and publishing them on the platform.

  3. Operation

    Monitoring of condition, damage and reports.

  4. Decision

    Maintenance programme, rehabilitation plan, budget decisions.

Network condition is rated in four classes

  • Good
  • Medium
  • Poor
  • Very poor

Aerial drone surveys and photogrammetry are carried out in partnership with MultiRotor Services.

Let’s talk about your road network

We work from the initial survey through to the launch of the platform, including training for your staff. A demonstration on part of your municipality can be arranged using your own data.